Work Packages

RevHydro comprises 6 Work Packages. These are summarised below.

Work Package 1: Runner Flow Control

Description: Develops high-fidelity models and control systems to extend turbine operation and reduce fatigue on the Francis turbine runner.

Objectives: Develop a numerical model to quantify runner fatigue and validate a Runner Flow Control (RFC) system to extend turbine lifespan.

Leading Partner: GE

Work Package 2: Draft Tube Flow Control

Description: Designs and implements a flow control system in the draft tube to stabilize pressure pulsations and improve turbine performance.

Objectives: Develop a reduced-order model for fatigue quantification, design a Draft Tube Flow Control (DFC) system, and validate through testing to reduce runner fatigue.

Leading Partner: LTU

Work Package 3: Intelligent Fish Barrier

Description: Develops an intelligent fish barrier (I-Fish) to minimize impact on aquatic life by redirecting fish safely away from turbines.

Objectives: Create and validate an experimental setup for I-Fish testing, develop behavior-based deterrents, and assess fish welfare in the presence of the barrier.

Leading Partner: ICPE

Work Package 4: Circular Economy

Description: Establishes sustainable refurbishment methods for hydropower equipment, integrating life cycle analysis and innovative materials.

Objectives: Develop refurbishment methods, conduct LCA/LCI/LCC studies, and implement circular models to enhance sustainability.

Leading Partner: IRCEM

Work Package 5: Dissemination, Communication, and Exploitation

Description: Manages project dissemination and stakeholder engagement through communication strategies and multi-actor forums.

Objectives: Develop a communication plan, engage stakeholders, monitor impact, and ensure effective knowledge transfer and exploitation of project results.

Leading Partner: IRCEM

Work Package 6: Project Management

Description: Ensures timely and high-quality results through efficient administrative, technical, organizational, and financial coordination.

Objectives: Oversee administrative and financial management, coordinate scientific and technological activities, ensure quality assurance, and manage ethics and risk.

Leading Partner: LTU

Scroll to Top