Work Packages
RevHydro comprises 6 Work Packages. These are summarised below.

Work Package 1: Runner Flow Control
Description: Develops high-fidelity models and control systems to extend turbine operation and reduce fatigue on the Francis turbine runner.
Objectives: Develop a numerical model to quantify runner fatigue and validate a Runner Flow Control (RFC) system to extend turbine lifespan.
Leading Partner: GE
Work Package 2: Draft Tube Flow Control
Description: Designs and implements a flow control system in the draft tube to stabilize pressure pulsations and improve turbine performance.
Objectives: Develop a reduced-order model for fatigue quantification, design a Draft Tube Flow Control (DFC) system, and validate through testing to reduce runner fatigue.
Leading Partner: LTU
Work Package 3: Intelligent Fish Barrier
Description: Develops an intelligent fish barrier (I-Fish) to minimize impact on aquatic life by redirecting fish safely away from turbines.
Objectives: Create and validate an experimental setup for I-Fish testing, develop behavior-based deterrents, and assess fish welfare in the presence of the barrier.
Leading Partner: ICPE
Work Package 4: Circular Economy
Description: Establishes sustainable refurbishment methods for hydropower equipment, integrating life cycle analysis and innovative materials.
Objectives: Develop refurbishment methods, conduct LCA/LCI/LCC studies, and implement circular models to enhance sustainability.
Leading Partner: IRCEM
Work Package 5: Dissemination, Communication, and Exploitation
Description: Manages project dissemination and stakeholder engagement through communication strategies and multi-actor forums.
Objectives: Develop a communication plan, engage stakeholders, monitor impact, and ensure effective knowledge transfer and exploitation of project results.
Leading Partner: IRCEM
Work Package 6: Project Management
Description: Ensures timely and high-quality results through efficient administrative, technical, organizational, and financial coordination.
Objectives: Oversee administrative and financial management, coordinate scientific and technological activities, ensure quality assurance, and manage ethics and risk.
Leading Partner: LTU